The City of Brandon retained AECOM to develop a Master Plan for its water utility, with the goal of developing a roadmap to guide operation, maintenance and upgrades, now and into the future.

While this Master Plan will outline a process to develop the City’s water utility over the long-term, some of the existing infrastructure at the Water Treatment Plant (WTP) will be in need of replacement or major upgrade in the next five years. Selected upgrades will need to align with future water demands, which will drive the need to make decisions for the longer term. The Master Plan will, therefore be used as a tool to address short-term needs while achieving long-term objectives.

 

pdf iconWater Utility Master Plan (19 MB)